- Jul 24, 2013
- 14,110
- 44,173
We've been shit at dealing with corners for years.“There was a lot of corner-cutting before the delay, but it’s gone the other way now” ???.
We've been shit at dealing with corners for years.“There was a lot of corner-cutting before the delay, but it’s gone the other way now” ???.
I should think the pace has dropped, for a start there's not as much to be done and if the stadium will be finished in January it'll surely be ready well before that.
“There was a lot of corner-cutting before the delay, but it’s gone the other way now” ???.
As it was designed before this came in it won't applyI was wondering about this wire/cabling issue the other day and thought it might have something to do with the new CPR guidelines that came in to effect in May. Maybe a certain grade of cable was specified but some the wrong type was installed. (CPR for those who don't know looks at the fire characteristics of the cable, it terms of the cable sheath and how it reacts and how quick it burns in a fire etc etc).
...probably nothing to do with that though
Leg room actually looks crazy. Hope it doesn’t make it to sterile and detract from atmosphere.
I always feel that when there becomes this much tension between client and contractor there is often more issues. As the blame game begins and people start to leave.. often the wrong people. And it's at the final curling that these people who know the project inside out are needed. This will no dought be dragged through the courts for years.I imagine we were getting updates before but probably when Mace said they were ready. I read that line as the club saying that we have now set when the updates come to ensure we are on track.
It is so rare that you see statements this direct - it suggests that the relationship between the club and Mace is extremely poor at the moment.
Might be something to do with the roof. Eg access to roof sections might be restricted by lighting gantries just a guessYeah that's what I figured, and they are perfectly correct, but I am getting desperate to see the pitch laid.
In which case wouldn't they have finished them a week or two ago and if that is the case I don't understand why they are delaying their installation by what may be up to a month, they are not dependant on anything else surely.
The new Lane is set up in certain sections to do this once it’s legal.Just a shame that the PL won't allow standing areas like they have at CELTIC park. They create a great atmosphere and are as safe as you get . I seen that there was a delegation at CELTIC park to look at the set up and consider it for PL clubs. Wpuld defp be a great feature..just ask the GREEN BRIGADE who occupy the area they create the buzzz around Celtic park
When you think of the wages these players are paid it shouldn't matter wether they play on a beach or a perfect pitch .they should be able to produce the goods at all times..i don't get this thinking that oh they arnt used to this surface or that.From a financial point of view on the face of it, moving in part way through the season if it's December or later would appear to be an advantage as opposed to remaining at Wembley.
I don't however fully buy into the idea that it makes obvious sense from a results on the pitch point of view , and I don't see how the likes of other teams can complain that they will be at a disadvantage compared to the teams we would have played at Wembley earlier. Fulham won't be complaining that way will they.
When you look at our results at Wembley over the whole of last season and this season to date, they stack up pretty well. We also had a pretty good Champions League record there last season, and overall finished 3rd when many were predicting the Wembley factor would see us drop out of the top 4.There is absolutely no guarantee we will immediately hit the ground running results wise and match or better the Wembley results by moving in say in January. We may take a little while to settle in and drop points at a crucial part of the season which may see us drop out of Champions League qualification. How would it measure then financially?
As I see it, results wise on the pitch it's a gamble that could go either way by moving in part way through if our form at Wembley remains similar to how it has been, if results on the pitch completely nosedive at Wembley over the next 3 months then it clearly is a no brainer in moving ASAP, but if we base it on recent form over the last year, things don't suggest that is going to happen because of being at Wembley.
Here are a couple of videos from my friend working at the new Stadium. If possible could some of you guys please subscribe to my channel. I only have two subscribers at the moment. Thank You so much ??
Just a shame that the PL won't allow standing areas like they have at CELTIC park. They create a great atmosphere and are as safe as you get . I seen that there was a delegation at CELTIC park to look at the set up and consider it for PL clubs. Wpuld defp be a great feature..just ask the GREEN BRIGADE who occupy the area they create the buzzz around Celtic park
Any idea chaps when the new Spurs Shop will open. I've booked my flight for the Cardiff match and whilst I will have to make do with Wembley for the match I was hoping the new shop might be up and running by then.
only one for the ladies it seemsI see lots of toilets and urinals but only 2 hand dryers
No doubt one of these scummy West Ham "workers" we have at the site is getting a free tan right now
https://www.constructionnews.co.uk/...s-pace-and-workforce-reduced/10035254.article
No detail... but from"insiders on the job"