A single planning application was what they did initially, several years ago. Now one phase has been built, the second phase is being amended and the third phase has to be submitted separately because it only had outline consent last time.
It's still an overall master-plan, more so now that the NDP is olinked into the overall regeneration scheme.
I reckon that aspects of the revised stadium can only be delivered if the extra housing can be built (££ from sales), if the pedestrian movements issue can be resolved and if the retractable pitch is acceptable (££ from NFL).
David, thanks again for illuminating this for us.
Do you mean the entire thing (new design) could turn on EH's attitude to three buildings that in all honesty make little impact on anyone's lives and never will?
You'd hope that their preference is simply one of the many interests to be considered in the total decision process.
But maybe it doesn't work like that.