- Aug 13, 2005
- 47,310
- 106,726
Another Planning Application Amendment for the hotel is waiting for a decision
Details: Non-Material Amendment to Conditions A4 and D1 of HGY/2023/2137 relating to design amendments of Plot 3 (The Hotel) including: building height; layout reconfigurations; delivery and servicing strategy; and the south podium.
Nothing major. A few design changes to the Consented Scheme.
The number of hotel beds stays the same at 180 beds but they have squeezed in an increase in residential floorspace (GIA) from 11,627m2 to 12,968m2 and increase in 11 residential units (from 49 to 60 units).
You'll never sing that!